wesolve
All articles
· magento · launch · checklist

Magento Launch Checklist: 9 Steps to Complete Before Go-Live

A nine-area Magento go-live checklist: hosting, security, performance, payments and tax, SEO and redirects, email, analytics and monitoring, deployment, and a post-launch smoke test with a rollback plan.

Magento Launch Checklist: 9 Steps to Complete Before Go-Live

Most launches fail in the last mile: a payment gateway left in sandbox, caches off, a missing redirect map. Go through these nine areas in order, and agree a rollback plan before launch day.

Nine areas to sign off before go-live

1. Hosting is production-ready

  • PHP version and extensions match your Magento release (server requirements)
  • PHP memory_limit high enough (Adobe recommends 2G)
  • HTTPS everywhere, certificate auto-renewing, one canonical host (www or not)
  • Cron running and all groups processing (cron jobs)
  • File permissions tight: writable only where needed (var, generated, pub/static, pub/media)
  • Backups scheduled and a restore tested
  • Capacity for launch traffic and campaigns

2. Security

  • Custom admin path, and admin access limited by IP or VPN where possible
  • Two-factor authentication on for every admin (2FA)
  • Test and agency accounts removed; each person has their own login
  • Latest security patches applied (security patches)
  • Security headers at the server (X-Content-Type-Options, frame options, CSP)
  • No customer data in debug logs

3. Performance and caching

  • Production mode (bin/magento deploy:mode:set production)
  • All caches on, Varnish as full-page cache (Varnish and Redis)
  • Check the cache actually hits (response headers) on key pages
  • Images resized and compressed; consider WebP
  • Be careful with Magento’s built-in JS bundling: it often makes pages slower; test before enabling
  • Test key pages for speed and Core Web Vitals (speed optimisation)

4. Payments, checkout and tax

  1. Every gateway on live credentials, webhooks pointing to production (payment gateways).
  2. A real order with a real card, captured, then refunded.
  3. Every payment method tested: cards, PayPal, instalments, cash on delivery.
  4. Tax correct per country and customer type (internationalisation).
  5. Shipping rates correct for each zone (shipping).
  6. Guest and logged-in checkout, desktop and mobile.

A gateway left in sandbox means orders that look paid but aren’t. That’s why step 2 uses real money.

5. SEO, URLs and redirects

  • Base URLs point to the production domain with HTTPS
  • Canonical tags on products and categories
  • Titles and descriptions on key pages
  • XML sitemap generated by cron and submitted to Search Console
  • robots.txt blocks checkout, account and internal search paths, and staging’s “noindex” is gone
  • 301 redirects for every old URL on a migration, tested before launch

6. Transactional email

  • Sending through a proper SMTP or email service, not the server’s local mail
  • SPF, DKIM and DMARC published for your domain
  • Sender names and addresses set (Stores > Configuration > General > Store Email Addresses)
  • Every template checked: order, invoice, shipment, credit memo, account, password reset
  • Each one triggered and checked in Gmail and Outlook inboxes

7. Analytics and monitoring

  • GA4 with e-commerce events (view, add to cart, checkout, purchase), verified in DebugView (Google Analytics)
  • Ad conversion tags firing on the success page, with cookie consent in place
  • Search Console verified
  • Uptime and error monitoring with alerts, plus application monitoring (New Relic, uptime)

8. Deployment

Build once, deploy the result: don’t compile on the live server during launch. Back up the database right before go-live, use maintenance mode only for the cutover, and lower DNS TTL a day ahead. Rehearse the whole sequence on staging (staging).

9. Smoke test and rollback

Within the first 30 minutes, in a private browser:

  • Home, category, product pages: images, prices, no console errors
  • Add to cart, guest checkout, logged-in checkout
  • Order email arrives, branded and correct
  • Admin login with 2FA; the test order is in Sales > Orders
  • Logs (var/log/exception.log, system.log) clean
  • Search, filters and the mobile menu work

Agree the rollback trigger in advance: for example, if checkout fails and isn’t fixed within 30 minutes, restore and switch DNS back. A delayed launch beats a broken one.

At wesolve, the team that builds the store runs the launch and the servers, with this checklist on every go-live. Talk to us.

FAQs

Should caches be off at launch? No. Production mode with all caches on, flushed after the final deploy.

Can I launch without staging? You can, but you’ll be testing payments and deployments on the live store. Don’t.

What if a gateway stays in sandbox? Orders look paid but no money is captured. Test with a real card.

Have an ecommerce problem?

Thirty minutes with an engineer — not a salesperson.

Book a discovery call